St. Louis Begins to Recover from Devastating Flooding
St. Louis has sustained historic flooding from the Meramec River, a relatively small Mississippi tributary that bombarded communities in the far southwestern reaches of the
St. Louis has sustained historic flooding from the Meramec River, a relatively small Mississippi tributary that bombarded communities in the far southwestern reaches of the
The Missouri Section of American Water Works Association (MSAWWA) has established a scholarship fund for qualified students enrolled in an accredited college or university in
A septic tank is the most common onsite sewage treatment system in use in Missouri. Nearly 30 percent of all housing units in Missouri use
The well-known symbol of St. Louis is in the process of being renovated. The Gateway Arch is a global icon and symbol of the St.
Metropolitan St. Louis Sewer District’s Project Clear is the initiative to improve water quality and alleviate many wastewater concerns in the St. Louis region. It
St. Louis has many large rivers that join and form the lower Mississippi River. The Illinois, Upper Mississippi and the Missouri along with the lower
The City of Columbia has an extensive sewer rehabilitation project in the development process. The project will begin along Flat Branch, installing a new pipeline
School is in session! An exciting time for freshman and upper-class men alike. One of the things that may not be a topic that is
The City Council in Columbia has agreed this month to move ahead on a reconstruction project. The Henderson sewer will be upgraded with approximately 8,000
Residents of St. Louis, we have had a time of it with an unfortunate sewer back up! In addition, heavy rains made for an even
Construction has begun in St. Louis on an impressive collaboration. The City is underway with an extensive repair and rehabilitation project. It is a 9.2
Many of us are experiencing a rainy season now that summer is in full swing. Along with the sunny delights and fanfare this time of
Residents of St. Louis, we have had a time of it with an unfortunate sewer back up! In addition, heavy rains made for an even
Summer is indeed here in all its glory. We know that means rainfall is here, too. In fact, in many parts of the Country we
LIVE DEMONSTRATIONS REGISTRATION JUNE 16TH – 18TH JAM PACKED WITH LIVE DEMOS & THE LATEST CIPP TECH. TUESDAY, JUNE 16TH THRU THURSDAY JUNE 18TH Don’t
Perma-Liner recently hosted a grand opening celebration at our new Illinois distribution facility. There were live demonstrations of our state-of-the-art processes, show specials and show day special financing.
ILLINOIS GRAND OPENING! MAY 20, 2015 This ONE-day event is jam-packed with live demonstrations and the latest CIPP technology! Register: info@perma-liner.com or 1-866-336-2568 DEMONSTRATIONS: Continuous
Got Profit? Zero Down. No Payments for 90-Days. Package Includes 600 FT of Liner Materials (Liner, Calibration Tube, Pull Tape and Epoxy Resins) VISIT OUR
Check out the schedule below and call 1-866-336-2568 to reserve your spot! ONE-ON-ONE TIME WITH FIELD TECHNICIANS, DEMONSTRATIONS: Perma-LateralTM Lining with Steam Cure, Sectional Point
The Perma-Lateral ™ lining system was developed in 1999 and remains the trusted brand in small diameter pipe lining. The Perma-Lateral ™ system is designed for
Our Waterline Renewal Technologies product lines are completely designed, manufactured, built and supported in the United States of America! The quality is best in class and you can trust Waterline Renewal Technologies to be here for you if and when you need support on this system.
Made in the U.S.A. means a lot. We take great pride in manufacturing this ultraviolet lining system here in the United States. Our pride shows in the component quality & longevity of our trenchless pipe lining equipment and systems.
It means something to us!
Address:
25 NW Point Blvd., Suite 560
Elk Grove Village, IL 60007
Phone: 847-457-1810
Emergency: 888-915-2477
(technical support)
Email: info@waterlinerenewal.com
Monday – Friday: 8:00am – 5:00pm CST